References

 

A selection of projects from 2024-2026

Client Project / Construction Project Activities Period
LT Immobilien Bonn GmbH Construction of a well system for operating a water-to-water heat pump Well capacity dimensioning, pumping test 11/25 – 12/25
Aufbau- und Entwicklungsgesellschaft Reconstruction of destroyed infrastructure Subsoil investigation 11/25 – 01/26
Akbari-Spiegel eGbR Architekturbüro Kneutgen Construction of a student residence hall Subsoil, hydrogeology, and waste declaration 10/25 – 01/26
Stadt Erkrath Grundschule Willbeck (Elementary School) Damage assessment 09/25 – 12/25
SBK Sozial-Betriebe Köln gGmbH Demolition of a former pigsty Hazardous material inventory, demolition concept, H&S plan 07/25 – 11/25
Stadt Schleiden Reconstruction Sturmiuspark (Civil engineering structures) Subsoil investigation and waste declaration 08/25 – 01/26
AREECON Entwicklungsgesellschaft mbH Construction of 9 semi-detached houses and one apartment building Waste declaration 07/25 – 09/25
Lanzerath Hausbau GmbH New construction of a residential complex with 3 apartment buildings Subsoil investigation and waste declaration 05/25 – 10/25
Rhein-Sieg-Kreis: Der Landrat Demolition of a former administrative building in the Rosbachtal nature reserve Hazardous material inventory, demolition concept, H&S plan 04/25 – 11/25
Stadt Sankt Augustin Road and sewer rehabilitation Subsoil investigation 05/25 – 10/25
Vision Bau 9 GmbH Co. KG New construction of two apartment buildings with connected underground parking Subsoil investigation and waste declaration 06/25 – 09/25
Mannstaedt GmbH Demolition of a former magazine/warehouse on the company premises Hazardous material inventory, demolition concept 04/25 – 07/25
Stadt Wesseling Conversion/Extension of Albert-Schweitzer-Schule, redesign of schoolyard, well capacity Hydrogeology, subsoil investigation, pumping test 05/25 – 02/26
Home Vision Bauprojekte GmbH & Co. KG New construction of an apartment building and conversion of existing buildings Subsoil investigation and hydrogeology 03/25 – 07/25
Bundesstadt Bonn (Tiefbauamt) Sewer rehabilitation Clemens-August-Straße and Meckenheimer Allee Sewer renewal 04/25 – 07/25
Bundesstadt Bonn (SGB) Construction of a school building on the fire station grounds Subsoil, waste declaration, contamination, construction supervision 04/25 – 12/25
HEKS GmbH i. G. Conversion of former Erich-Kästner-Schule for residential use (contaminated site) Remediation supervision 03/25 – 01/26
Stadt Erkrath Moisture damage at object "Sporthalle und Gymnasium am Neandertal" Hydrogeology, groundwater measurement, monitoring 02/25 – 08/25
Herr Juborai Talukder Construction of an apartment building with kindergarten (infill development) Subsoil investigation and hydrogeology 03/25 – 04/25
Abwasserwerk Stadt Bad Honnef Road and sewer renewal Subsoil investigation 02/25 – 05/25
Klein Immobilien GmbH Co. KG New construction of three apartment buildings with shared underground parking Subsoil, hydro, waste declaration, construction supervision 02/25 – 06/25
Wohn- und Heimbau eG New residential complex and demolition of "Simons-Eck" Subsoil, hydro, declaration, hazardous material inventory 04/25 – 05/25
Bundesstadt Bonn (SGB) Extension of the outdoor pool Ennertbad into a combined pool Subsoil, hydrogeology, and waste declaration 02/25 – 05/25
VEBOWAG Vereinigte Bonner Wohnungsbau AG Demolition of a multi-family row house Hazardous material inventory, demolition concept 01/25 – 05/25
Stadt Troisdorf New multi-purpose hall; Risk assessment regarding abandoned mining Subsoil investigation, mechanical deep drilling 11/25 – 05/25
Wasserverband Rhein-Sieg-Kreis Conversion of flood retention basin Ohbach and watercourse development Subsoil investigation, slope stability analysis 09/25 – 11/25
Dr. Gottschalk Nahrungsmittel GmbH & Co. KG Construction of an external warehouse on company premises Subsoil investigation and hydrogeology 01/25 – 07/25
Bundesstadt Bonn Assessment of a suspected contaminated site Hazardous material inventory, demolition concept, contamination report 10/25 – 02/25
Mannstaedt GmbH Construction of new Gatehouse (Gate C) and new truck parking areas Subsoil investigation and waste declaration 11/24 – 04/25
MAXIM-Holding GmbH & Co. KG Settlement damage at two warehouses, Pharma Aldenhoven GmbH Geotechnical and expert opinion 11/24 – 02/25
Aufbau- und Entwicklungsgesellschaft Construction of a pumping station / well (Project Ahrbrück) Well drilling, pumping test 04/25 – 05/25
HUK Coburg; SV Schindler Settlement damage due to a burst water pipe Damage assessment / Forensic investigation 04/24 – 10/24
GDPR Cookie Consent with Real Cookie Banner